PolyJet Job Scheduling

One of the most important maintenance tasks on our PolyJet equipment is cleaning the heads.  This involves taking rubbing alcohol and a clean room cloth and wiping the heads.  This is very easy to do, but needs to be done within an hour of every print job.  To make this convenient, Stratasys has incorporated the Job Scheduler in Objet Studio.  This allows the user to schedule a job to start when they need it and when they’ll be available to clean the heads.

If this is the first job in the queue we’ll need to stop it as Objet Studio likes to start jobs automatically after we hit the print button.  Simply select the Job and Click Stop.  Reference the job I have below.  It is a 26 hour build and I want it to finish at 8:00 am Monday morning.  Next, right click your job and a shortcut menu appears.

, PolyJet Job Scheduling, PolyJet Job Scheduling

, PolyJet Job SchedulingSelect the Clock Icon which will launch the Job Scheduler.  Select the desired start date and time.  In this case, I’ll need to start on Sunday at 6am in order to finish when I’m walking in the door on Monday (Take note the Day and Month are switched on these machines from the factory).

, PolyJet Job Scheduling

Click OK and you see your job status has changed to “On Schedule’.  Take note of the material usage, we’ll need that in the next step.

Switch over to the Printer Computer (Scroll Lock-Scroll Lock-Enter if you have the KVM Switch) and verify you have the material you need.  Objet Studio will not notify you of low material during a job schedule.

, PolyJet Job Scheduling

Remember to click the red dot to put the printer in “Online” mode and it will turn green.  That’s IT!

Come Monday morning I’ll have a part waiting for me on the printer.  Once removed I’ll be able to clean the heads and move to the next job.

Have any questions?  Let me know in the comments below!

  • Share this
Find Your Design Solution in the CATI Store.
Browse Products